Extensions:








Click on the miniature images below to enlarge:

<<Notes on this photo:

 

This shows the new kitchen area when completed
This shows the exiting kitchen ceiling being ripped down and all the electrics. These were all replaced and tidied up.
This shows the blockwork during the build of the new dining area
This shows the rear of the new extension with the completed pitch roof and french doors. The mound of waste was put to good use as we built a patio with steps down to the garden area.
This shows the view from the new dining room to the kitchen and the laminated wooden flooring that we laid down
This shows a close up of the kitchen units and the ceramic flooring that we put down for these clients in the kitchen area
This shows the suspended kitchen unit and breakfast bar.
This is the view of the utility room leading through to the bathroom
The utility room and bathroom
This shows the bath and tiling we completed.